INDOT SR-140 Bridge Replacement

INDOT bridge replacementINDOT bridge replacementINDOT bridge replacement
INDOT bridge replacement
INDOT bridge replacement
INDOT bridge replacement

Our team provided geotechnical exploration and engineering on State Road 140 to replace an existing bridge. The client planned to construct a temporary runaround requiring new embankments and a new bridge while the existing bridge was being replaced. However, we worked closely with the client to examine the existing foundation capacity for maintenance of traffic (MOT) loading and eliminated the need for temporary runaround construction.